Drakes Renewables were commissioned to install a 45kWp solar system above the plant area on the roof of Britannia Leisure Centre in Hackney. The bespoke mounting system was specifically designed to meet the unique requirements of the building.
The installation not only fulfilled but exceeded the London Plan’s criteria, maximising the electricity that can be used by the building. This solar system plays a key role in improving the building’s energy efficiency and sustainability, generating renewable power and significantly reducing operational costs.
![Image](https://drakesrenewables.com/wp-content/uploads/2025/01/Britannia-Leisure-Centre-solar-roof-construction.webp)
Project overview
- Hackney
- 38,707 kWh per annum
- Greenwich Leisure Limited
- CO₂ tonnes saved yearly 7.5
- 44.88kWp system
- <4 years
- Solar Canopy
- Equivalent no. of trees planted per annum: 10
![Image](https://drakesrenewables.com/wp-content/uploads/2025/01/Britannia-Leisure-Centre.webp)