Solar power
case study
Quality Solar Solutions
Addressing climate change
Drakes Renewables were directly engaged to maximise bill savings for Grundfos Pumps’ manufacturing warehouse in Bedfordshire.
The installation was carried out in close collaboration with the existing commercial electricians, Lockcraft, who brought their in-depth knowledge of the existing LV setup. Since completing the project, we’ve continued to collaborate with Lockcraft on several additional projects, further strengthening our partnership and delivering efficient energy solutions.
![Image](https://drakesrenewables.com/wp-content/uploads/2025/01/Grundfos-PV-inverter-scaled.webp)
Project overview
- Bedfordshire
- 117,040 kWh per annum
- Grundfos Pumps
- CO₂ tonnes saved yearly 22.6
- 123kWp system
- 5 years
- Manufacturing Warehouse, extension of existing system
- Equivalent no. of trees planted per annum: 31
![Image](https://drakesrenewables.com/wp-content/uploads/2025/01/Grundfos-solar-roof-scaled.webp)